PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Excavation for the underground sanitary sewer Facing South (800x600).jpg Saw cutting Rahway ave Facing the bridge from the 3rd Floor (800x600).jpg Starting installing safety rails at Elev. 1,2,3 (1st Floor) Facing South (800x600).jpg Stripping the shear wall panels at Elev. 5,6 (3rd Floor) Facing West (800x600).jpg Continued installing pour stops around Derrick -3 (2nd Floor) Facing North-West (800x600).jpg
Next page Excavation for the underground sanitary sewer Facing South (800x600)
Excavation for the underground sanitary sewer Facing South (800x600)